img26

Contact Us

FAQs

Precision Machined Products

ARQUE Versatile Dispensing Nozzles

What is the lead time?
- Roughly one week after order, if the product is in stock.
Please contact us about lead times for custom products and ruby nozzles.
Can I buy just one piece?
- No, the minimum order quantity is 10 pieces.
What is the material?
- The material is SUS303.
Can you do non-standard sizes?
- We can fully customize your order to any inner and outer diameters.
There are, however, limitations on tip thickness, so be sure to consult with us in advance.
Do you do coating treatments?
- Yes we do.
We can do WR, Aegis, Teflon, Tosical S and other coatings.
Can you make fixtures for nozzle mounting?
- We make fixtures only to go with Tecdia-made nozzles.

Needles

What is the lead time?
- Two weeks after order for the metal type, and three weeks for the diamond type.
Can I buy just one piece?
- No, the minimum order quantity is 20 pieces.
What is the material?
- You can choose from tungsten carbide, HSS, piano wire, palladium alloy, and diamond.
What is the smallest standard size (diameter) you offer?
- The smallest is φ0.4 mm.